List, board and calendar
You can look at a project in three ways: as a list, as a board with a column per section, or as a calendar in which every task sits on its day. The data is the same; only the view differs.
Choosing a view
At the top right of a project are three buttons: List, Board and Calendar. The pressed button is the view you see now. On a phone they form a bar under the title.
- The choice belongs to the project, not to you: it applies on all your devices and to everyone you share the project with. If someone puts the project on a board, you see a board.
- Upcoming only has List and Calendar (tasks from all your projects). That choice, and whether the calendar shows a month or a week, is remembered only by the device where you make it.
- An older version of the app does not know the choice and always shows the list. No data is lost there.
The board
The columns are the sections of the project, preceded by No section for tasks that are in no section. A card is a task with the same parts as a row in the list: the circle, the name, and below it the date, the number of subtasks, the labels, a bell and who it is for. Subtasks show as a counter on the card of their task; open the task to see them.
- Completing: click the circle, just like in the list. Opening: click the card.
- Adding a task: choose Add task under a column; the task goes into the section of that column.
- Sections: choose Add section (the dashed column on the right) for a new column. With the ⋯ next to the name of a column you rename it or delete it (with all the tasks in it).
- Completed tasks are not on the board. At the bottom is Show completed tasks (3) to show them.
- A section you collapsed in the list is simply open on the board.
Moving a card
- Dragging with the mouse: grab a card and drag. Drop it on the top or bottom edge of another card and it goes before or after it, also in another column; drop it on the heading or in the empty space of a column and it goes to the top or bottom of that column. A line or frame shows where it will land. Esc cancels. Dropping on a card does not make the task a subtask: do that in the list. Drag a card onto a project in the sidebar and the task moves to that project.
- With a finger: press and hold a card, then drag. Keep your finger near the left or right edge of the board and the board scrolls by itself to the next column.
- With the keyboard: Alt+↑ and Alt+↓ move the card one place up or down in the column; Alt+← and Alt+→ put it in the column next to it, at the same height (or at the bottom if that column is shorter). A screen reader announces where the card is now.
- Without dragging: every card has a button with an arrow, Move to…. It opens a list of all the columns of the project; choose one and the card moves, to the end of that column. On a phone that button is always visible.
Subtasks always move with their task. Moving also works without a connection and is sent later, like any other change.
The board on a phone
A column is almost as wide as the screen and a bit of the next column sticks out behind it. Swipe sideways and the board snaps exactly to the next column. The board scrolls within itself; the page does not scroll sideways.
The calendar
The calendar shows a month or a week (choose Month or Week at the top right; the app remembers what you chose). The week starts on Monday. On the left of every row is the week number by the ISO rule: week 1 is the week with the first Thursday of the year, so 1 January can still fall in week 52 or 53 of the previous year. The names of days and months follow the language of the app. You browse with the arrows next to Today; that button takes you back to today.
- Tasks sit on their date. A task with a time shows that time and sits at the top of the day in order of time; tasks without a time come first. Today has a colored day number.
- Colour. At the top you choose what the colour of a task is based on: Colour: priority (the default), Colour: project or Colour: label (the first label with a colour). The app remembers your choice on this device.
- Overdue is separate. Tasks whose date has passed are not on their old day but in an Overdue block above the calendar, with their date. Move them or complete them and they leave the block.
- Repeating tasks also sit on their coming occurrences in the range shown, with a dashed edge and a repeat icon. That is only a preview: nothing is stored, and an occurrence that is not due yet cannot be completed or dragged. Complete the task itself (on its first date) and it moves on to the next time.
- Completing and opening: the circle on the left of the bar completes, a click on the name opens the task window.
- Adding a task on a day: click the + on the right of a day (it appears when you point at the day). The Add task window opens with that date already filled in; you only type the name. In a project the task goes into that project, in Upcoming into your Inbox.
- Many tasks on one day: the month view shows four; the rest are behind +N more, which opens the week of that day.
- Completed tasks are not in the calendar, and only the date counts: a deadline without a date gets no place.
Moving a task to another day
- Dragging: grab a task and drop it on another day; the day lights up. The date changes, the time stays and a repeat stays as it was: for a repeating task only the current date moves. So completing remains different from moving. After dropping there is a message with Undo. Tasks from the Overdue block can be dragged to today or another day in the same way. On a phone you press and hold the task first.
- Deadlines: if an open task has a deadline, that day also shows a line with a flag and the name of the task. Click it to open the task; completing and moving is done with the task itself on its date.
- Completed tasks: with the Completed button in the bar of the calendar, ticked-off tasks are shown too, struck through, on the day you ticked them off. The circle in front of it reopens a task. The choice applies to all calendars on this device.
- With the keyboard: put the focus on a task and press Alt+← or Alt+→ for a day earlier or later, and Alt+↑ or Alt+↓ for a week. The focus stays on the task.
- It also works without dragging: open the task and choose another date, or use the calendar button on the row in the list.
The calendar with the keyboard
With Tab you reach one day of the calendar (the chosen day); the tasks and buttons in it are ordinary buttons.
| Key | What happens |
|---|---|
| ← → | One day back or forward. |
| ↑ ↓ | One week back or forward. |
| Page Up Page Down | One month (or in the week view one week) back or forward. |
| Home | To today. |
| Enter | Add a task on the chosen day. |
| Alt+arrow on a task | Move the task one day (left, right) or one week (up, down). |
The calendar on a phone
A table with seven columns is too tight for a phone. There the calendar shows a list per day: a heading per week, and under it every day with its name, its number, a plus to add a task and its tasks as large bars. In the month view only the days from today on remain, and not the days of another month. Choose Week to see all seven days of a week.
The timeline: planning with hours
In the calendar, choose Timeline and next to it Day or Week. You see the hours of the day; a task with a time is at its place and as tall as its duration (half an hour without one). Tasks at the same time stand side by side. Tasks without a time are at the top under All day; a red line shows the current time.
- Scheduling: on the right (below on a phone) is To schedule: your tasks without a date, and what is overdue. Drag one to a day and time.
- Moving: drag a task to another time or day, or to All day to remove the time. It snaps to a quarter of an hour; a recurring task keeps recurring.
- Longer or shorter: drag the bottom edge of a task.
- Adding: click an empty spot: Add task opens with that day and time filled in.
- Keyboard: on a task, Alt+↑/↓ moves it a quarter of an hour and Alt+←/→ a day.
- On a touch screen, hold a task for a moment before dragging; a normal swipe scrolls.
You can undo every change from the message at the bottom. The choice between Month, Week and Timeline (and Day or Week) is kept on this device; on a phone the timeline starts with a single day.
Upcoming as a calendar
In Upcoming choose Calendar at the top right: you see the tasks of all your projects in the calendar, with the name of the project next to them. Everything above applies there too; a task you add goes into your Inbox. Today has no calendar: a single day has no use for one.
Subtasks in Today and Upcoming
When a task in Today, Upcoming or the list of a label or filter has open subtasks, there is an arrow next to the number of subtasks. Click it and the subtasks appear below; another click folds them away. That only applies here: in the project itself the task stays as it was.
Sorting and grouping
With the Sort button at the top right of a project (as a list), in Today and in Upcoming you choose how the tasks are arranged:
- Sort by: Manual order (the order you drag them in), or by Name, Date, Priority, Deadline, Date added or Assignee, ascending or descending. Names ignore capitals and accents, and task 2 comes before task 10. Tasks without a date, deadline or assignee are always at the bottom.
- Group by: the sections (the default in a project), or by date, priority, label, assignee, project or deadline. A task stays with its sub-tasks.
Your choice applies only to you (also in a shared project) and on all your devices. While you use your own sort or grouping, the button is highlighted and you cannot drag tasks within the list; dragging to another project in the sidebar still works. Restore default puts everything back.
Your own order in Today
In Today the tasks come first without a time, then by time and then by priority. If you want it differently, drag a task to another place in its group (Overdue or today), or put the focus on it and press Alt+↑ or ↓. That order applies only to you, also for tasks in a shared project, and stays on all your devices. A task that is added later comes at the bottom. Dragging an overdue task to today is not possible: give it a new date, for example with Reschedule. Under Sort, Clear your own order removes your own order again.
What is not possible yet
- Dropping a card on another card to make it a subtask: that is only possible in the list.
- A repeating task that started more than about eleven years (daily) or 4000 occurrences ago shows no coming occurrences any more.